Moisture Mapping & Drying Goals
The contractor takes a dry standard reading from unaffected drywall, trim and flooring in the same building. That number, close to the material's equilibrium moisture content, becomes the drying goal for every wet area.
- Pin and pinless meter readings
- Marked map of wet boundaries



